Our facilities offer the life science industry 7,500 ft² completely designed to integrate and test packaging equipment prior to site installation.
Our facilities offer the life science industry 7,500 ft² completely designed to integrate and test packaging equipment prior to site installation.
Machine Shop Facilities
Conference Rooms
Truck Docking Station
110 PSI/45 CFM of Compress Air
Internet Connections (Wifi)
Materials Storage Area
Integration Area 3,000 ft²
Kitchen & Bathroom Facilities
Electrical Utilities 480/277 & 208/120 VAC 3 Phases

“Enormous! Being in Puerto Rico and near our facilities was great. Our engineers and operators
were able to obtain a hands-on experience while performing the Pre-FAT and FAT activities. The
Team was always accessible with open communication, in disposition, and responding our needs with
solutions. They are trusted and reliable.”
